View Single Post
Old 09-10-2014, 04:50 PM   #1
Sdspeed
Senior Member
 
Join Date: Sep 2012
Location: San Diego
Posts: 732
Construction 9/11/14 LJ Launch Update

Avenida De La Playa Infrastructure Replacement Project &
Sewer and Water Group 809


Avenida De La Playa Infrastructure Replacement
In order to accurately locate the existing sewer lateral for 2148 Avenida De La Playa, the contractor will work outside the fenced area on Thursday, September 11 until approximately 12 P.M.

Beginning at 7 A.M. the sidewalk on the north side of Avenida De La Playa will be closed and pedestrian access blocked outside 2148 Avenida De La Playa in order for the contractor to remove the concrete sidewalk panel, verify the location of the existing sewer connection leading to this business, take photographs, document the existing elevation and install a trench plate cover. This work is being done to provide improved connection between the sewer main being replaced in the roadway and the adjacent business.
Sdspeed is offline   Reply With Quote